Securing masonry arches
The armor of the foundation of phase I
Particular anchoring of the metal profiles in the foundation
Reinforcement of perimeter walls in reinforced concrete at the basement stage I
Foundation armature, stage II stage, particular bottom elevator pit
View of stage II foundation armor with metal profiles positioned
Foundation floor and concrete walls of the basement
Underground base roof slab
View of the elevator shaft and the flight of stairs
Assembly of metal frame elements
Assembly of metal frame elements
View of metal frame
View of the elevator shaft and metal frame
Particularly bracing
View of running metal frame
View of the Hi-Bond floors of the 2nd, 3rd and 4th level phase I
Phase II metallic frame view completed up to the cover
Phase II metallic frame view completed up to the cover
Hi-Bond stage II floor
Hi-Bond stage I floor with concrete slab casting
Application of the network in PBO system FRCM on masonry arches
Realization of the XJoint connectors in the PBO network on the arches
Hi-Bond stage II floor view with concrete slab casting
Masonry arch view
Lay insulation panels on the steel structure of the roof